Major refit 2014. Hull and mast sanded down and repainted in AWLGrip Whisper Gray. New running rigging. Installed black water tank and lavac toilet. New mainsail, yankee jib, and storm jib. Electronics upgraded. 2015 Anchor chain re-galvanized, test links load tested. 2016 new standing rigging. 2017 new 130% drifter. (See costed list of renovations below.)

The former double 8mm headstay was replaced with a single 10mm stay and Facnor headsail furler. The double 8mm forestay was replaced with a single 10mm stay. I did not install a furler on the forestay, because the staysail and storm-jib are the last defence in heavy weather and must be extremely reliable.  The hank-on staysail is easily and quickly handed, and makes a very powerful combination when used alone with deeply reefed main. With storm jib, even more so.